SCROLL
Independent dental office project planning

Know your number before you sign anything.

Flat-fee budget planning for dentists starting, relocating, or building a practice. I don't sell equipment, construction, or loans — I build the one document your lender, contractor, and equipment rep all have to answer to.

Typical startup, 2026
$750K+
My fee vs. project cost
~1%
DSCR lenders look for
1.25×
Commissions taken
$0 — ever
The Alithos film · 74 seconds

Why dentists choose an advisor who sells nothing.

Follow the money

Everyone at your table is paid by your project getting bigger. Except one seat.

Every dental office project comes with "free" help. None of it is free — it's priced into the equipment order, the loan, or the lease. That doesn't make those people dishonest. It makes them salespeople.

WhoWhat they offerHow they're paidWhose side?
Equipment dealer design team"Free" office designMargin on the equipment orderThe sale's
Lender project manager"Free" project coordinationInterest on a bigger loanThe bank's
Tenant-rep broker"Free" site searchLandlord-paid commission at signingThe closing's
Design-build firmBundled plan + constructionProfit on the build they scopeThe build's
Alithos AdvisoryThe independent budget planFlat fee, paid by you aloneYours

FOR THE RECORD — IN 2019 THE FTC ISSUED A FINAL ORDER AGAINST TWO OF THE INDUSTRY'S LARGEST DISTRIBUTORS FOR CONSPIRING TO DENY DISCOUNTS TO DENTAL BUYING GROUPS. INDEPENDENCE ISN'T A SLOGAN; IT'S A BUSINESS MODEL.

Who I work with

Three projects. One question: what will it really cost?

01 — De novo startup

Your first practice

You're 2–10 years out of school and ready to own. Before you tour a showroom or sign a letter of intent, you need one honest number: what this project actually costs — and whether the cash flow carries it.

How to open a dental practice →
02 — Relocation

Relocating or rebuilding

Your lease is up in 12–24 months, or the space stopped fitting years ago. Your office is your second-biggest expense — and you get one chance every 5–10 years to fix it.

Relocating a dental practice →
03 — Ground-up build

Building from scratch

Land, shell, finish-out, equipment, contingency — the biggest check a dentist ever writes. Every vendor at the table profits when it gets bigger. I don't.

Building a dental office ground-up →
Try the math

What does your project pencil at?

A live planning estimate from the same model behind every Budget Plan. Move the sliders — watch what op count and finish level do to the loan your practice has to carry.

PLANNING MATH, NOT A QUOTE — 15-YR AMORTIZATION AT 8.25%, VERIFIED INDUSTRY COST RANGES, 1.25× LENDER COVERAGE STANDARD. YOUR BUDGET PLAN RUNS THIS AGAINST YOUR PRODUCTION DATA.

Estimated total project
—
Space program—
Equipment & imaging—
Construction & cabinetry—
Est. monthly debt service—
Collections needed @ 1.25×—
LIGHTER LIFT1.25× LINEHEAVIER LIFT
Talk it through with Dan (free)

What does a dental office project cost? 2026 planning ranges

Total project cost — build-out, equipment and imaging, cabinetry, IT and furnishings, soft costs, and working capital — by operatory count, project path and finish level.

Estimated total dental office project cost by operatories, path and finish level, 2026
SizeLease / TI · standardLease / TI · premium + CBCTGround-up · standardGround-up · premium + CBCT
3 operatories 1,500 sq ft$604K–$668K$803K–$888K$900K–$995K$1,151K–$1,272K
4 operatories 2,000 sq ft$746K–$824K$989K–$1,093K$1,140K–$1,260K$1,452K–$1,605K
5 operatories 2,500 sq ft$887K–$980K$1,174K–$1,298K$1,379K–$1,525K$1,754K–$1,938K
6 operatories 2,700 sq ft$969K–$1,071K$1,283K–$1,418K$1,501K–$1,659K$1,909K–$2,110K
7 operatories 3,150 sq ft$1,100K–$1,216K$1,456K–$1,609K$1,721K–$1,902K$2,186K–$2,416K
8 operatories 3,400 sq ft$1,192K–$1,318K$1,578K–$1,744K$1,862K–$2,058K$2,366K–$2,615K
9 operatories 3,825 sq ft$1,319K–$1,458K$1,744K–$1,927K$2,073K–$2,291K$2,630K–$2,907K
10 operatories 4,250 sq ft$1,445K–$1,598K$1,910K–$2,111K$2,283K–$2,523K$2,895K–$3,200K

Methodology. Space at 500 sq ft per operatory (450 for 6–7 ops, 425 for 8+). Construction at $170–$220/sq ft for lease finish-out and $340–$420/sq ft for ground-up. Equipment at $42,000–$58,000 per operatory; imaging $60,000 (sensors + pano) or $130,000 (with CBCT). Cabinetry 10% and soft costs 12% of construction, IT and furnishings $45,000 + $3,000 per op, $85,000 working capital. Ranges are ±5%. Planning assumptions checked against published industry ranges, not a quote — your market, site and scope move these numbers. Land is not included for ground-up builds.

Full dataset and methodology (with CSV download) → · Free calculators →

The engagement — price published, on purpose

A $750,000 decision deserves a verified plan.

Most firms make you book a sales call to learn what they charge. Here's mine, up front. Flat fee, scope in writing, no commissions behind any line of it.

Step one

Feasibility Check

$2,500FLAT · CREDITS TOWARD THE BUDGET PLAN
  • Go / no-go financial screen
  • Space & site fit assessment
  • High-level equipment budget range
  • DSCR pre-check vs. the 1.25× standard
  • A straight answer: is this project ready?

Feasibility Check details →

Start here
Most engagements

The Budget Plan

$7,500–$10,000FLAT FEE · SCOPE SET IN WRITING BEFORE WE START
  • Space requirement analysis — ops, sqft, growth room
  • Line-item equipment & imaging budget
  • Build vs. lease vs. condo cost projections
  • Section 179 & tax modeling
  • Production targets & cash-flow analysis
  • Debt-service coverage analysis
  • The lender-ready package your bank underwrites from

Budget Plan details →

Book a free Project Fit Call
Published in full — the process is the product

Five weeks. Six phases. One verified number.

01

Vision of success

What you want to produce, how you want to practice, what the office must do for your life — before a single square foot is drawn.

DELIVERABLE — VISION & GOALS BRIEF
02

Practice data intake

The Trust & Verify questionnaire: production, new-patient flow, schedule pressure, lease status. Existing practices bring six months of real numbers; startups model from verified benchmarks.

DELIVERABLE — BASELINE DATA FILE
03

Space & equipment program

Operatory count and square footage from production math, not showroom enthusiasm. Then a line-item equipment budget priced against verified industry ranges — not one dealer's quote.

DELIVERABLE — SPACE PROGRAM + EQUIPMENT BUDGET
04

Project cost modeling

Build, lease, or condo — side by side: shell and finish-out, cabinetry allowances, contingencies, soft costs. You see what each path costs before anyone shows you a rendering.

DELIVERABLE — BUILD VS. LEASE VS. CONDO MODEL
05

Trust, then verify

The stress test: debt-service coverage against the 1.25× standard, Section 179 and tax math, the production increase the new facility demands — and an honest conversation if the numbers say wait, shrink, or restructure.

DELIVERABLE — DSCR & TAX ANALYSIS
06

The lender-ready package

Everything bound into one document your bank underwrites from, your contractor bids against, and your equipment rep quotes against — plus a working session so you can defend every number in any room.

DELIVERABLE — THE BUDGET PLAN
Coming 2027 · The Alithos app

Know your number. Now in your pocket.

Six tools from Dan's playbook in one app for iPhone and Android. Model the project, check every quote, compare leases, track the build, and stay bankable after opening day.

Alithos app icon
Alithos
iPhone & Android · 2027 · No ads, no vendor money

Be first in line for 2027.

Waitlist members get the prototype preview today, early beta invites on iPhone and Android, and a direct line to tell us what to build.

  • Prototype sneak peek, unlocked right away
  • Beta tester invites before public launch
  • Your feature ideas reviewed by Dan and the build team
My phone

The prototype preview is for waitlist members.

Join in 20 seconds to unlock 12 screens from the early build.

Help build it.

Upvote what's on the roadmap, or send an idea. Dan and the build team read every one.

  • Phase 1Scenario Modeler
  • Phase 1Quote Check quote scanning
  • Phase 1Lease Analyzer
  • Phase 2Project Portal + Message Dan
  • Phase 3Ramp Tracker
  • Phase 3Home-screen widgets

Prototype screens show illustrative sample data. Features and timing may change before launch.

Dan Ellyson, founder of Alithos Advisory DAN ELLYSON — FOUNDER
About

I've sat on every side of the table. Now I only sit on yours.

I've spent my career inside dental office projects — space and equipment budgets, financing, real estate — watching the same story repeat: a smart clinician surrounded by helpful people, every one of whom earns more when the project gets bigger.

The dealers aren't villains. The good ones genuinely like my clients — a doctor with a verified budget closes faster, changes orders less, and pays on time. But none of them can be your advocate, because none of them are paid to be.

So I built what I kept wishing my clients had: a flat-fee plan from someone with no line on the invoice. The model behind it — I call it Trust and Verify — turns your production, your market, and your debt capacity into one number you can defend in any room. A true line doesn't flatter and doesn't negotiate. It just shows you what's really there. That's the job.

— Dan EllysonFOUNDER, ALITHOS ADVISORY · SERVING DENTISTS NATIONWIDE

More about Dan and how he works →

The Alithos blog

Straight numbers, no pitch.

Guide · 21 min read

How much does it cost to open a dental practice in 2026? The itemized answer.

Not a range with a shrug — a line-item walk through space, equipment, imaging, working capital, and the categories that quietly double.

Read →
Decisions · 13 min read

Build, lease, or condo: run the numbers before you fall in love with a building

The three-path model I run for every client — and the debt-service math that decides it, whatever the renderings look like.

Read →
Independence · 11 min read

The "free" office design isn't free. Here's what it really costs.

Dealer design teams do real work — and recover every hour of it in the equipment order that follows. How to use free design safely.

Read →
Common questions

Asked, answered, in writing.

Why pay for this when the dealer designs my office for free?

Dealer design is paid for by the equipment order that follows it. It can be good work — but nobody whose paycheck depends on a bigger order will tell you to build smaller. I will, when the numbers say so.

When should I engage you?

Before you sign anything — the letter of intent, the equipment order, the loan application. The plan is worth the most when nothing is committed yet. Already signed a lease? A plan can still catch the next six figures of decisions.

How long does it take?

Most Budget Plans complete in 3–5 weeks from kickoff, depending on how quickly we can gather your production and financial data.

Will my bank accept the plan?

The package maps directly to what dental lenders underwrite: total project cost, cash-flow analysis, and debt-service coverage against the 1.25× standard. Lenders prefer prepared borrowers — that's the point.

Do you take referral fees from lenders, dealers, or brokers?

No — in either direction, ever. Referrals flow in because prepared clients are good business for everyone at the table. Not one dollar flows back. If anyone ever offers, you'll hear about it from me first, with the word "no" attached.

All questions, answered →

30 minutes · no pitch · no obligation

Find out what your project really costs.

A Project Fit Call is a working conversation, not a sales call. Bring your timeline and your questions — leave with a straight answer.

Ask Dan a question

Not ready for a call? Ask in writing.

One question or ten. Dan replies personally within one business day.